Next week, we have the countertop people come out to template the work. They should be done and installed in three weeks or so. In the meantime, we should be able to install the trim, floor, finish electrical, run the drainline for the sink, and finish the laundry area. If you aren't busy, give me a call; I'm sure I can put you to work.
18 November 2007
Cabinets almost done
Next week, we have the countertop people come out to template the work. They should be done and installed in three weeks or so. In the meantime, we should be able to install the trim, floor, finish electrical, run the drainline for the sink, and finish the laundry area. If you aren't busy, give me a call; I'm sure I can put you to work.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment